Merfman
Member
I think I'm getting the 3rd one... they have their demo (blue), another blue due in February then my Raven in March...
I hope they get the packing figured out, their demo looks like it was packed with a ball peen hammer taped lightly
to the tank...
I hope they get the packing figured out, their demo looks like it was packed with a ball peen hammer taped lightly
to the tank...